Bath District (Supply) Engineer filing related to special tests and procedures

Reference Number
0312/2/2/1/13
Level of Description
Item
Title
Bath District (Supply) Engineer filing related to special tests and procedures
Creator(s) & Administrative History
Wessex Water Authority.
Date
1975-1977
Extent
Extent: 1 item
Description
Filing of R. C. Onslow, the Bath District Engineer. Includes test results for pumping, watertightness and accuracy of bulk metering in South Side; flow tests at Oakford Main-Northend to Churchill Bridge; 1966 site test results for Charlcombe Pumping Station; Hampton Down Reservoir bulk meter, watertightness and flow; North Side reservoir discharge.

Also includes flushing and sterilisation programme for Primrose Hill Reservoir inlet and outlet mains; programme of works to be carried out to the introduction of operations of the new Royal School Reservoir and Primrose Hill Pumping Plant; procedure for Washpool Station shutdown; schedules for cleaning Monkswood.
Placeholder image - no image is available for this record